Preparation of submittals often precede the start of excavation and construction, especially when contaminated soil has been identified. These submittals will define the work procedures used by contractors to protect workers as well as general public. These plans must be site-specific and often, must be prepared or reviewed by a Certified Industrial Hygienist.
- Pre-Construction Plans/Submittals
- Site-Specific Health & Safety Plans
- Soil Management Plans
- Confined Space Entry Plans
- Lead Management Plans
- Construction Site Safety Support
- Periodic Safety Inspections / OSHA Compliance
- Training / Respirator Fit-Testing / Confined Space Entry
- Silica Monitoring
- LEED Post-Construction Indoor Air Quality Testing
- Mold Assessment / Testing